House Remodel - South Frontal View
 
Here's a Southerly skewed perspective from the front. This provides a glimpse of the courtyard and South side of the garage. (Note this series is missing the initial 29 Sep 2003 timepoint).
 

   


Foundation Work Done. Roof Removed.
2nd Floor Prep Work. Installed Fence.
2nd floof framing underway. (Note: This timepoint is missing in Frontal series.)
2nd floor framing done.
Framing for central section.
Framing for front section.
Roof installed.
Front entryway & garage roof work. Old windows removed.
Roof Shingles Installed. Should Last 100 Years.
Radius roof completed and new window installation started.
Windows and doors installed. Electric, plumbing, and ducts in. Gone garage door.
15 Feb 2004: Garage door installed. Waterproof paper and chicken wire in place.
Wayne and Russ Roofener are the GCs. These guys are great!