AC Installation Days 1 and 2
 
Progress, progress. Getting the upstairs air handler installed.
 

   


Our crew hard at work installing the expansion valve.
Air handler after Day 1
Downstairs wall opening
Attic Day 2 with Electrical
Upstairs hole in the wall
Finished installed duct
Finished installed duct #2
Third corner duct, keeping the Glee Club cool
Upstairs bathroom duct location
Stairway duct location
First bedroom duct location
Corner bedroom duct location
Odd things that fall out of walls #1
Odd things in walls #2: bottle