| | Building 422 Historic stair | |
| | | Building 422 Historic cooridor | |
| | | Building 420 elevator being installed | |
|
| | Building 420 hallway carpeted and trimmed | |
| | | Building 420 hallway carpeted and trimmed | |
| | | Building 420 historic cooridor prime painted | |
|
| | Building 420 historic cooridor windows being painted | |
| | | Building 420 elevator lobby light installed | |
| | | Building 424 hallway painted and ready for carpet and trim | |
|
| | Building 424 historic stair ready to be prepared for paint | |
| | | Building 424 most units are painted and ready for cabinets and finishes | |
| |