| | Bldg 422 Parking lots paved | |
| | | Bldg 422 Layout for re-paving of parking on Gann Way | |
| | | Bldg 422 Adjusting historic entry door | |
|
| | Bldg 422 Preparing main lobby for paint | |
| | | Bldg 422 Historic cooridor being painted | |
| |
| | | Bldg 422 Unit ready for occupancy | |
| | | Bldg 422 Roof tile being completed | |
|
| | Bldg 422 Layout of storage units | |
| | | Bldg 422 Storage units being installed | |
| | | Bldg 424 Installing sheet rock | |
|
| | Bldg 424 Preparing sheet rock for texture | |
| | | Bldg 424 Applying texture to sheet rock walls | |
| |