| | Bldg 422 Installing carpet |
|
|
| | Bldg 422 Renovating historic entry |
|
|
| | Bldg 422 Historic stair ending at ceiling |
|
|
| | Bldg 422 Attic mechanical system |
|
|
| | Bldg 422 Roof tile wired into place |
|
|
| | Bldg 420 Electrical being installed |
|
|
| | Bldg 420 Installing sheetrock |
|
|
| | Bldg 420 Sheetrock complete. Waiting for tape and mud. |
|
|
| | Bldg 420 Plumbing and electrical in the walls |
|
|
| | Bldg 424 Infill of veranda wall |
|
|
| | Bldg 424 Electrical room rough-in |
|
|
| | Bldg 424 Bankers inspect the progress |
|
|  |