Villas at Hamilton
Construction Progress Photos - September 6, 2002

   

Bldg 422 Hallway sheetrock installed.


Bldg 422 Hallway lighting systems being installed.


Bldg 422 Wood base being installed.


Bldg 422 Window trim being installed.


Bldg 422 Liquid masking applied to windows before painting.


Bldg 420 Veranda stucco nearly complete.


Bldg 420 Body color and window trim underway.


Bldg 420 Metal studs being installed.


Bldg 420 Utility systems in hallway ceiling.


Bldg 420 Copper piping being installed.