| | Bldg 422 Hallway sheetrock installed. |
|
|
| | Bldg 422 Hallway lighting systems being installed. |
|
|
| | Bldg 422 Wood base being installed. |
|
|
| | Bldg 422 Window trim being installed. |
|
|
| | Bldg 422 Liquid masking applied to windows before painting. |
|
|
| | Bldg 420 Veranda stucco nearly complete. |
|
|
| | Bldg 420 Body color and window trim underway. |
|
|
| | Bldg 420 Metal studs being installed. |
|
|
| | Bldg 420 Utility systems in hallway ceiling. |
|
|
| | Bldg 420 Copper piping being installed. |
|
|