| | Bldg 422 Ceiling of lounge being framed. |
|
|
| | Bldg 422 Sheetrock installed, ready for paint. |
|
|
| | Bldg 422 Utility systems in ceiling of hallway. |
|
|
| | Bldg 422 Handicapped shower/tub being installed. |
|
|
| | Bldg 422 Veranda walls complete ready for paint. |
|
|
| | Bldg 420 Exterior paint started. |
|
|
| | Bldg 420 Superintendent showing where stove will go. |
|
|
| | Bldg 420 David Rose, owner, inspecting progress. |
|
|
| | Bldg 420 Metal studs underway. |
|
|
| | Bldg 424 Restored transom windows being painted. |
|
|
| | Bldg 424 Utility systems started. |
|
|  |