| Villas at Hamilton Owners Richard Hall and David Rose |
|
|
| | Bldg 422 Historic roof tile staked so new roof membrane can be installed. |
|
|
| | Bldg 422 Installing wiring for lights, power, and cable. |
|
|
| | Bldg 422 Utility systems being installed in corridor ceiling. |
|
|
| | Bldg 422 Closing in old verandas for senior homes. |
|
|
|
| | Bldg 420 Loading metal stairs into the building. |
|
|
| | Bldg 420 Loading metal stairs into the building. |
|
|
| | Bldg 420 Foundations around bldg backfield and compacted. |
|
|
| | Bldg 420 Entry walls being formed. |
|
|
| | Bldg 420 Renovated windows being installed. |
|
|
| | Bldg 420 Closing opening where old chimney was removed. |
|
|
| | Bldg 424 Foundation construction started. |
|
|
| | Bldg 424 Rebar installed for earthquake bracing. |
|
|
| | Bldg 424 Rebar installed for earthquake bracing. |
|
|