Villas at Hamilton
Progress Photos June 13, 2002


Bldg 420 New foundations poured around outside of bldg.


Bldg 420 Renovating windows.


Bldg 420 Installing interior rebar for earthquake bracing.


Bldg 420 Shear wall ready for concrete.


Bldg 420 Shear walls ready for concrete.


Bldg 422 Original roof tiles moved to place new water proof membrane.


Bldg 422 entry stairs being formed.


Bldg 422 Metal studs and sheet rock ready to be installed.


Bldg 422 Metal studs and sheetrock started.


Bldg 422 Interior metal framing started.


Bldg 422 Drain lines being installed in basement.