| | Bldg 420 New foundations poured around outside of bldg. |
|
|
| | Bldg 420 Renovating windows. |
|
|
| | Bldg 420 Installing interior rebar for earthquake bracing. |
|
|
| | Bldg 420 Shear wall ready for concrete. |
|
|
| | Bldg 420 Shear walls ready for concrete. |
|
|
| | Bldg 422 Original roof tiles moved to place new water proof membrane. |
|
|
| | Bldg 422 entry stairs being formed. |
|
|
| | Bldg 422 Metal studs and sheet rock ready to be installed. |
|
|
| | Bldg 422 Metal studs and sheetrock started. |
|
|
| | Bldg 422 Interior metal framing started. |
|
|
| | Bldg 422 Drain lines being installed in basement. |
|
|
 |