| | Building 422 Foundation wall for entry stairs and ADA ramp being formed. | |
| | | Building 422 Reinforcing steel being welded into openings in base. | |
|
| | Building 422 Walls layout on floor ready for metal studs. | |
| | | Building 422 - Stocking metal studs into the building. | |
|
| | Building 422 Anchors in attic floors. Ready for new structural shearwall. | |
| | | Building 420 Rebar being added for earthquake bracing. | |
|
| | Building 420 Rebar in old openings. To be filled with concrete. | |
| | | Bldg 420 Drill concrete to install additional rebar for earthquake bracing. | |
|
| | Bldg 420 Laying out to drill rebar to connect new foundations to the building. | |
| | | Bldg 424 Foundation pier drilling complete. Equipment waiting to be moved. | |
|
| | Bldg 424 Drilling holes to install additional steel beams. | |
| |