Villas at Hamilton
Construction Photos May 23, 2002

   

Building 422 Foundation wall for entry stairs and ADA ramp being formed.
Building 422 Reinforcing steel being welded into openings in base.
Building 422 Walls layout on floor ready for metal studs.
Building 422 - Stocking metal studs into the building.
Building 422 Anchors in attic floors. Ready for new structural shearwall.
Building 420 Rebar being added for earthquake bracing.
Building 420 Rebar in old openings. To be filled with concrete.
Bldg 420 Drill concrete to install additional rebar for earthquake bracing.
Bldg 420 Laying out to drill rebar to connect new foundations to the building.
Bldg 424 Foundation pier drilling complete. Equipment waiting to be moved.
Bldg 424 Drilling holes to install additional steel beams.