| | 7am of day one....ready to start. |
| | | Excavation is underway. The straw worked....no frost! |
| | | By 2pm the same day the footings are formed and got poured. |
|
| | The next day the forms for the poured walls were set and the walls got poured. |
| | | Heres the wall forms being stripped the day after the walls were poured. |
| | | The materials show up on Golden Eagles boomtruck. |
|
| | The foundation is backfilled and capped. Now ready to start framing walls. |
| | | The first floor framing is soon to be completed. |
| | | There will be a log porch on this end of the house. |
|
| | | Trusses and rafters are being set. The fireplace chase is also being framed. |
| |
| | The framing is just about completed and the porch will be next. |
| | | Ready for roofing, windows and split log. |
| | | Roofing is done and the windows are in. |
|
| | The tubing for the infloor heat is installed and ready for the basement floor. |
| | | An interior photo from the loft. |
| | | Exterior split log is finished. Fascia and railings are next. |
|
| | Stone is on the exterior fireplace chase. Ready for staining. |
| | | Soffit, fascia and railings are completed. |
| | | Walls and ceilings are done, hickory flooring is in. Cabinets are next. |
|
| | Interior stone is done on the fireplace. Split log is almost completed. |
| | | Looking from the dining area. |
| | | Furniture is moved into the greatroom! |
|
| | Another view of the greatroom. |
| | | | Exterior staining is done. This is Sikkens "Cedar". |
|
| | From the deck in front of the greatroom. |
| | | A mix of knotty pine and textured drywall in the bedroom. |
| |
| | | Summer is here and the grass is green. |
| |