Thunderbird Garage
Construction of my 4 1/2 car Bird house. Ten years in planning, a year from the permit stage to completion.
   

6/14/04. Finally breaking ground.
6/18/04. Rough excavation complete.
7/5/04. Footers & foundation done.
9/23/04. Block, framing completed.
10/27/04. Sheathing completed.
11/2/04.Metal roof, floor insulation done.
11/4/04. Six inch concrete floor being poured.
11/05/04. Floor curing and ceilng insulation complete.
11/12/04. Windows installed. 12' lift bay.
11/19/04. Doors installed, exterior in progress.
11/30/04. Exterior stone, finish grading complete.
1/2/05. Trim & interior/exterior painting complete.
1/26/05. Cars are in! Installing RaceDeck.
1/27/05. RaceDeck flooring finished.
1/27/05. Finally moving the tools in.
1/27/05. The only time I've driven the '66 in snow. 10'.
1/27/05.Glass cupola goes on top in the Spring.
1/27/05. Don's '63 in the nest.