Status as of 5/11/06

Neville Island now has about 50% of its track complete and I created some cardboard mock-ups of the buildings on the western end. With some spray paint, these were decent stand-ins for the MCR convention. It also helps get an idea of how things will look prior to building the actual structures.

 

Pictures (click on any pictures for a larger view)

 

       
 The grey buildings in the background are Dravo. Foreground building is Lee C. Moore and back right is Vulcan Detinning.  This is Vulcan Detinning. The two curved turnouts are both 15-18 inch radius (#9 frogs).  Another view of Vulcan Detinning. Lee C. Moore to the left.  The backside of Dravo and Vulcan Detinning.
       
 Dravo Light Metals in the background and the main Dravo building up front. Pittsburgh Gear will be the siding to the left.  I probably put close to 40 hours into this pair of switches and the curved crossing. I took time, but I am happy with the results.  Dravo on left. Lee C. Moore in the middle. In the back are two buildings (red) that I just put out to fill space. They won't be used here.  Neville Chemical and USS Chemical on the left. Shanango Coke plant in the background. The coke works was built by Bob Clark. The chemicla plant was built by Lloyd Heck. I am happy that they both have a home on my layout.
       
 A look down the partially finished yard.  A better view of Bob's coke plant that will be Shanango Coke.    

Previous Construction Page