Week 2
January 9-15, 2006
   

A bump-out has been added to the kitchen.
The entrance and pantry are torn down.
This wall will move out 5 ft.
Preparing for the bump-out
Removing the food pantry in the back.
Jeremiah the wrecking crew.
Ripping down the bad wall.
Ugly.
Good Bye wall.
A temporary storage shed holds some lumber.
Framing for the bump-out.
The bathroom sink will move to this alcove.
What is left of the entry.
A profile of the bump-out.
The studs will be removed.
Sorry neighbors.
Jeremiah enjoys the construction.
JJ helps the crew.
The new pantry wall gows up.
The entrance is rebuilt on an actual foundation.
Griffin & Jeremiah.
New windows installed in back.
Installing one of the new windows.
The new foundation under the entry and pantry.