Week 1
January 1-8, 2006
   

Work begins on the exterior to prepare for the bump-out.
This is a shot looking into the mudroom from the fron door.
The wall between mudroom and pantry is removed.
Gutted kitchen.
All the wood is in great shape.
The bathroom door will be moved.
This is where the fridghe will go.
Workshop.
Our sink and counter will run the length of the wall under the windows.
The washer isw now downstairs.
The oven and cabinetry will be here.
The oven can now be pushed back about 3ft.
The plans.
This is what is under the floor.
This was the whole for the former chimney.
The making of a laundry room in basement.
All the new windows and doors are downstairs.