| | I love the smell of sawdust in the morning. | |
| | | But, we're off shopping for slate at Urban Ore. | |
|
| | Calvin inspects the parts. | |
| | | Then off to select some bathroom hardware. | |
|
| | | More aluminum, clean lines, very clean, too clean? | |
|
| | Choices, choices, all for a little soap. | |
| | | Back at Zocalo, work progresses. | |
|
| | Sarah, of Kahn Design, meets with Chris, contractor & me. | |
| | | The seal goes down on the JavaGym floor. | |
|
| | Looking into the JavaGym. The floors will be covered. | |
| | | With the JavaGym empty, Chris helps unload stuff. | |
|
| | This is about a 1/4 of it, if that. | |
| | | Here's the other end of the container. | |
|
| | Calvin hangs out while things go up around him. | |
| | | Here the glass is removed from the front windows. | |
|
| | | Here's granite being cut for the condiment bar. | |
|
| | Preparing the condiment counter for the granite. | |
| | | Then put the granite in place. | |
|
| |
| | | Note the large open space on the wall behind the counter? | |
|
| | These will be faced with chalkboard menus. | |
| | | Here Mitch & Calvin watch, the doorway gets attention. | |
|
| | A bit of a close up on the doorway work. | |
| | | Another box up on the wall. | |
|
| | A light moment as the day comes to a close. | |
| | | Even later, Terry Z of Espresso Parts, starts his work. | |
|
| | This man loves his job, and does it well. | |
| | | His son, playing on a picked up $35 guitar, entertained. | |
|
| | Another day, more progress. | |
| | | Here Sarah, architect, Jorge and Chris, contractor. | |
|
| | | In the kids area, the walls match the trim color. | |
|
| | In between will be magnetic chalkboard painted walls! | |
| | | A parting shot from Calvin in the stockroom. Goodnight. | |
|