| | The mesh down, finally tied together. | |
| | | Then comes the concrete, poured in through a hose. | |
|
| | Smoothing it almost immediately is necessary. | |
| | | Everyone has a job to do, shoveling, pouring smoothing | |
|
| | It's a big enough floor they had to do it in sections. | |
| | | Pouring new concrete while the other portion is smoothed. | |
|
| | | Color is added to the base colored concrete as an accent. | |
|
| | | Done with that section, time to wait for another load. | |
|
| | Meanwhile, the back door goes 4' east for easier access. | |
| | | This is the stockroom and bathrooms all framed out. | |
|
| | SW from on top the new bathroom in the JavaGym | |
| | | Electrical gets finishing touches by "Peru" | |
|
| | The next batch of concrete arrives! | |
| | | and it's back to pouring and finishing the front floor. | |
|
| | The wooden bar is for first pass smoothing and levelling. | |
| | | One of the concrete guys smoothing, with color added. | |
|
| | It takes a whole lot of smoothing. | |
| | | Here's the base color of the concrete. | |
|
| | Here's the color before it's troweled into the surface. | |
| | | Final pass at smoothing it all out, it'll get a sealant later. | |
|
| | These guys were troweling it smooth for hours. | |
| | | Here's the nearly finished product. | |
|
| | Calvin leaves his impermanent mark | |
| |