Aug 8
Concrete is done in the JavaGym, now on to framing up the stockroom and bathrooms, and preparing the front for more concrete!
   

New floor. Ready for building on. This is the old bathroom.
JavaGym will have rubber matting down over this.
Behind counter framed out to pour a slope into a floor drain.
Chicken scratchings. From this they build?
Chris Osborn, of Aasand, making chicken scratchings.
Which takes this, and...
...quickly makes it this.
Working on the new bathroom on the North wall.
The old bathroom, now smaller, on the South.
Our stockroom now featuring interior door and stairs!
Shot of Chris, looking East. Up top will be enclosed storage.
A man proud of his work.(This doorframe was misplaced.)
Jose Juan, Juan Carlos, and Chris at the end of a long day.