| | After getting down to bare dirt, level, place 4" of gravel. | |
| | | On top of that goes a moisture barrier, plastic. | |
|
| | Calvin loves the open space. | |
| | | On top of that goes 4" of sand. and wiring tubing. | |
|
| | | Here Hank directing things in the JavaGym. They're leveling | |
|
| | and tamping, in preparation for... | |
| | | the sand, on top of which is metal mesh, on which goes | |
|
| | | And lots of it, I can tell you. | |
|
| | So that it very quickly goes from sand to ... | |
| | | Concrete floor. These guys work fast. | |
|
| | Closing in on the end of this section of floor. | |
| | | Just about done pouring it out. | |
|
| | | The comes the Trowel Machine... The helicopter... | |
|
| | Which does the work of four men and their friends. | |
| | | But to get it just right, it has to be done by hand. | |
|
| | Some sample colors for the front floor, going in week's end | |
| |