| | 5/23/03: Unloading the plane at home. | |
| | | 5/23: The entire airframe. | |
| |
| | | 5/24: Part is parts, inventoried and organized. | |
| | | 5/25: Boom tube on the stands, ready to begin. | |
|
| | 5/25: Cable exit holes at the tail. | |
| | | 5/25: Stick mixer attachment holes. | |
| | | 5/25: Aileron cable pass-throughs. | |
|
| | 5/26: Russ Hauser cleaning up and taping the control surface gussets (with a broken finger!) | |
| | | 5/26-27: Painting the boom tube. | |
| | | 5/27: Prepping and painting steel and unanodized aluminum parts. | |
|
| | 5/28: Boom tube painted and cables run. | |
| | | | 5/28: Test fitting vertical fin and tailwheel. | |
|
| | 5/28: Control horns installed on ailerons and rudder. | |
| | | 5/29: Installing the verticals and spar carry-throughs. | |
| |
| | 6/1: Installing the cross-over tubes. | |
| | | 6/1: Connecting the rear cables. | |
| | | 6/1: Installing the tailwheel. | |
|
| | | 6/3: "Spider" assembly installed. | |
| | | 6/5: Control mixer installed. | |
|
| | 6/5: Rudder pedals and heel rests installed. | |
| | | 6/6: Pausing for a glamour shot. | |
| | | 6/7: Rigging the front cables. | |
|
| | 6/7: Connecting up the rudder and tailwheel. | |
| | | 6/8: Finishing up the front cables. | |
| |
| | 6/10: Horizontal, vertical stabilizers, rudder, and elevator connected. | |
| | | | 6/11: Testing the tail folding mechanism. | |
|
| | 6/12: The streamline cockpit enclosure - testing with a sheet. | |
| | |
| | | 6/21: Ailerons connected. | |
| |
| | | 6/28: Fuel system installed. | |
| |
| | 6/29: Friend Pancho tries out the twin 20mm cannons. Great for competition! | |
| | | | 7/4: Posing naked after painting cabin area flat black. | |
|
| | 7/5: First six control surfaces covered. | |
| | |
| | 7/10: Hard doors finished and nosepiece fitted. | |
| | | 7/10: Streamline rear enclosure finished. | |
| | | 7/13: The flap pushrods would've exited through the rear window. | |
|
| | 7/13: Plates I made to raise the flap torque tube. | |
| | | 7/13: Wings finished, ailerons and flaps working. | |
| |
| | 7/16: Stratomaster Extreme instrument is installed. | |
| | | 7/17: In-air adjustable IvoProp is installed. | |
| |
| | | | 7/23: First full flight - takeoff, exactly two months from delivery. | |
|
| | 7/23: Climbout. The only tweaking it needed was a trim tab on the elevator. | |
| | | 7/27: Finished with wheelpants. | |
| |
| | 7/27: Time to take it apart and ship it to the World Microlight Championships. | |
| | | Click "Shipping to England" at the top of the page to see the packing process. | |
| |