Building a Hawk Sport
Steve Bensinger is at it again. Here's a quick look at how things are going. Updated 7/31/03.
Click a pic to see a larger version.

   

5/23/03: Unloading the plane at home.
5/23: The entire airframe.
5/23: Box 1.
5/23: Box 2.
5/24: Part is parts, inventoried and organized.
5/25: Boom tube on the stands, ready to begin.
5/25: Cable exit holes at the tail.
5/25: Stick mixer attachment holes.
5/25: Aileron cable pass-throughs.
5/26: Russ Hauser cleaning up and taping the control surface gussets (with a broken finger!)
5/26-27: Painting the boom tube.
5/27: Prepping and painting steel and unanodized aluminum parts.
5/28: Boom tube painted and cables run.
5/28: Iceboat?
5/28: Test fitting vertical fin and tailwheel.
5/28: Control horns installed on ailerons and rudder.
5/29: Installing the verticals and spar carry-throughs.
5/30: Squaring the nose.
6/1: Installing the cross-over tubes.
6/1: Connecting the rear cables.
6/1: Installing the tailwheel.
6/2: The seat installed.
6/3: "Spider" assembly installed.
6/5: Control mixer installed.
6/5: Rudder pedals and heel rests installed.
6/6: Pausing for a glamour shot.
6/7: Rigging the front cables.
6/7: Connecting up the rudder and tailwheel.
6/8: Finishing up the front cables.
6/9: Flap mechanism.
6/10: Horizontal, vertical stabilizers, rudder, and elevator connected.
6/10: Tail done.
6/11: Testing the tail folding mechanism.
6/12: The streamline cockpit enclosure - testing with a sheet.
6/13: Hanging the wings.
6/16: Struts installed.
6/19: Flaps connected.
6/21: Ailerons connected.
6/21: Flaps down.
6/26: Engine mounted.
6/28: Fuel system installed.
6/29: Taped spar tapers.
6/29: Friend Pancho tries out the twin 20mm cannons. Great for competition!
7/1: The sails arrive!
7/4: Posing naked after painting cabin area flat black.
7/5: First six control surfaces covered.
7/6: Cabin cover fitted.
7/7: How d'ya get in?
7/10: Hard doors finished and nosepiece fitted.
7/10: Streamline rear enclosure finished.
7/13: The flap pushrods would've exited through the rear window.
7/13: Plates I made to raise the flap torque tube.
7/13: Wings finished, ailerons and flaps working.
7/15: The tail is done.
7/16: Stratomaster Extreme instrument is installed.
7/17: In-air adjustable IvoProp is installed.
7/21: Rollout!
7/21: Wings installed.
7/23/03: First Crowhop!
7/23: First full flight - takeoff, exactly two months from delivery.
7/23: Climbout. The only tweaking it needed was a trim tab on the elevator.
7/27: Finished with wheelpants.
7/27: With big brother.
7/27: Time to take it apart and ship it to the World Microlight Championships.
Click "Shipping to England" at the top of the page to see the packing process.