| | The frames were put together first. | |
| | | Canopy structure and building table, | |
|
| | Glassing the planking after butt joints. | |
| | | Butt joints, secured with polymer nails. | |
|
| | Attaching the frames to MDF station mold | |
| | | Story board, measures down from baseline | |
|
| | Frame attached to mold, centered, level | |
| | | Storyboard to center and level frame | |
|
| | Tried to clamp frames in position | |
| | | Decided later to let frames float. | |
|
| | Mold stations were stiffened and braced | |
| | | Place frames on correct side of line. | |
|
| | Molds were trimmed to fit station frames | |
| | | Stems attached to planking. | |
|
| | ALL LINES were drawn on the planking! | |
| |