| | | Setting the timbers and the hill over hang. | |
| |
| | Laser cut steel parts assembled. | |
| | | | Ron & David Lawerence using the 1" to move the turntable to the pit. | |
|
| | Installing the turntable decking | |
| | | Wall construction on the roundhouse | |
| |
| | Steps leading down to walk in storage at rear. | |
| | |
| | Elevtated tracks in rear. | |
| | | View from the walk in space. | |
| | | Exterior before staining. | |
|
| | Exterior stained with door frames | |
| | |
| | Completed Roundhouse 8/25/04 | |
| | |