Ed Cross Residence
Cross residence pictures of construction and finished home. First project completed by NHICF
   

12" X 24" footings will carry the weight easily
ready for the first pour
45 degrees forms for an octogon tower on the end
Waterproofed below grade and backfilled
Interior shot of walls and third floor deck
Backside of building before windows install
Interior shot with window wall framed
Watertight shell and begining of winter work
Interior picture
Window wall from first floor
Window wall from second floor
Interior pic of octogon tower
Another interior picture
Ready for siding
End tower will be sided with applied stone veneer
Allmost finished with landscaping installed
Cultered stone octogon and Hardiplank siding
Backside with finished siding. Great job Crosses!!