| | Block on site begining of December. poured | |
| | | ICF construction proceeds year round | |
| | | Second level being placed with concrete pump | |
|
| | Carl Huntoon and helper placing concrete | |
| | | View from rear of building with walkout | |
| | | Floor system hung off walls with bolts and ledger | |
|
| | Building with roof on and windows in | |
| | | Vinyl siding applied directly to exterior of ICF | |
| | | Sun tubes light up hallway with no additional energy | |
|
| | Allways on sun tube lighting interior bath | |
| | | Ground water source heat pump with storage tank | |
| | | Allmost completed exterior of home | |
|
| | Deep window wells of ICF structure | |
| | | Blower door test of 0.08 air changes per hour!!!!!!!!!!!!!! | |
| | | Richer 5-Star. Every home should be this good. | |
|