| | | First floor deck finished | |
| | | Don't mess with the lady in the basement | |
|
| | Second level of project started | |
| | | Footings are poured and block is started | |
| |
| | Mr. Cumbee keeping an eye on the project
| |
| | | Deck with waterproofing applied-4"walls started | |
| | | Walls completed and ready for concrete placement | |
|
| | Concrete pumping on a cool morning | |
| | | The only way to build a home | |
| | | Trench for ground source heat pipes to be laid | |
|
| | Stick framed garage and shingled roof | |
| | | Winter arrives-front porch frostwall | |
| |