LTP 1/22/04
 
About 2 weeks into construction at the end of these pics.
 

   


Framing in the carport to add studio space. The AC unit is huge, but essential.
The entire bottom floor is going to become the studio.
Shot from the live room looking to the control/overdub room.
Floated floors for the overdub room and control room help tighten up the sound.
Back of the control room with the utility room in the back left.
Cable trough with conduit under floor. Rockwool is packed into floor boards.
Back of utility room with mic safe and power/cpu rack.
Close-up of floated floor using U-Boats.
Close up of the gap between overdub and control rooms.
Front of control room with the workbench brought in as space gets tighter.
Back of control room facing utility room entrance.
Front wall of overdub room. 14" thick rockrool wall which serves as a bass trap.
Sliding glass doors frames set between overdub and control rooms.
Live room with control room on the left.
Live room through new garage door opening. Acoustical garage door incoming.