Getting Done
Interior work from 22 Feb to 4 March shows the end is much nearer
   

The dormer only needs shingles to finish
Interior of the dormer before insulation
Dry wall sheets 12 ft. long don't reach quite to the peak
Looking toward the "connector" and the existing sun room
View from the existing sun room. Cement boards screwed down.
Tiles about half done in large section of the room.