| | Metal being cut in the parking garage level | |
| | | View into atrium from our studio window | |
|
| | Across the atrium on the fifth floor | |
| | | Our studio window viewed from the dining area | |
|
| | Living room window on right, bedroom on left | |
| | | The rails surround the hole for kitchen plumbling | |
|
| | Another look to the parking garage level and demolition | |
| | | The metal roof will be replaced with glass | |
|
| | | Vertical view of the atrium | |
|
| | A look from close to where are condo entrance is | |
| | | Most of the concrete ceiling will be visible | |
|
| | Our constuction manager and developer | |
| | | Studs making up the hallway and storage closets | |
|
| | Walls around the elevators are cut at the bottom | |
| |