Condo 11:11:04
 
 
Photos from the progress so far on the condo. Demolition is nearly complete and studs are starting to go up on our floor.
 
   


Metal being cut in the parking garage level
View into atrium from our studio window
Across the atrium on the fifth floor
Our studio window viewed from the dining area
Living room window on right, bedroom on left
The rails surround the hole for kitchen plumbling
Another look to the parking garage level and demolition
The metal roof will be replaced with glass
Across the atrium
Vertical view of the atrium
A look from close to where are condo entrance is
Most of the concrete ceiling will be visible
Our constuction manager and developer
Studs making up the hallway and storage closets
Walls around the elevators are cut at the bottom