Twelfth & Langdon
 
Replacement of joists and new deck installation precedes the last stretch of box gutter.
 

   


New laminated beam (3 x 2x14) in position
North support of main beam
North side - masonry being completed
South support of main beam
Looking north - beam in place
Close-up of south support - box being built
Beam tie-in with existing support of verandah
Roof beams inserted into galvanized sleeves at left, beams in place
West view from ML study
Southwest view from verandah roof
Note slope development and pitch towards the box gutter
Plywood deck in place
Verandah to left - space will accommodate future box gutter
Decking installed - tar paper cover (NW View)
SW View: Note box gutter start at left
Replacement wiring for PorteCochere fixtures and Porche Light
Beam is now tied back into existing structure
North view of Beam connected to verandah beam.
Copper liner being installed
Tongue and Groove ceiling being installed
Coming together: new ceiling, roof beams, and tuckpointing
North side: The last few remaining feet of verandah gutter yet to be rebuilt...
Twelfth & Langdon: September 09, 2004