| | New laminated beam (3 x 2x14) in position |
| | | North support of main beam |
|
| | North side - masonry being completed |
| | | South support of main beam |
|
| | Looking north - beam in place |
| | | Close-up of south support - box being built |
|
| | Beam tie-in with existing support of verandah |
| | | Roof beams inserted into galvanized sleeves at left, beams in place |
|
| | | Southwest view from verandah roof |
|
| | Note slope development and pitch towards the box gutter |
| |
| | Verandah to left - space will accommodate future box gutter |
| | | Decking installed - tar paper cover (NW View) |
|
| | SW View: Note box gutter start at left |
| | | Replacement wiring for PorteCochere fixtures and Porche Light |
|
| | Beam is now tied back into existing structure |
| | | North view of Beam connected to verandah beam. |
|
| | Copper liner being installed |
| | | Tongue and Groove ceiling being installed |
|
| | Coming together: new ceiling, roof beams, and tuckpointing |
| | | North side: The last few remaining feet of verandah gutter yet to be rebuilt... |
|