Home

Construction 4
Riser construction and seat installation.
   

Riser construction.
Riser construction.
Riser construction.
Riser with seat installed.
Insulation in riser.
Two risers 15" and 30" high.
Buttkicker mounted to riser.
Buttkicker on riser.
Installing seats.
Installing Seats.
Installing Seats.
Buttkicker 2 behind seat.
Back row of seats and middle row of armrests.
View of middle riser with carpeted rear riser showing.
Installing seats.
Rear riser getting carpet.
Carpet on rear riser.
Applying tile to floor under front row of seats.
Front row of seats installed.
Testing out the seats.
Seats installed.
View towards rear of theater.
SVS CS-Ultra subwoofer going in.
Cutting carpet for theater.
Stairs to seats with rope lights under lip of stairs.
Carpeting front of theater and stage.
Stage and theater with carpet installed.
View of right rear of theater.
Aura bass shacker pro mounted in front row seats.
Subpanel before column is attached.
View down entrance aisle.
Equipment closet.
Front of equipment closet.
Equipment closet with door open and side panel off.
Closet with door partially closed.
equipment closet with door closed.
Closet with side panel attached.
Closeup of equipment.
Closet door closing.
Equipment closet closed.