Home

Construction 2
Ceiling painted. Stage constructed. GOM going up.
   

View of left side of theater showing minisplit.
View of theater Exit and projector ceiling outlet.
Rear of theater showing subpanel.
Ventilation fan.
Corner detail of soffit and Ceiling.
Front of theater with painted ceiling.
Lights over front stage.
Ceiling with holes for lights.
View of projector mount holes and smoke detector.
Stage going in.
Another view of the stage.
Filling the stage with sand.
Closeup of sand in stage.
Adding curved front to stage.
Stage with curved steps.
View of stage.
Outlets for powered speakers and curtains. Conduit for stage rope lights.
Putting plywood on stage.
Fitting stage plywood.
View of stage and screen wall.
Putting in 3000 lbs of sand in stage.
Stage with sand installed.
Veiw toward front of room.
View of projector.
Projector mounted to ceiling.
Frame of screen up on wall.
Applying furring strips to wall.
installing linacustic and GOM to Screen Wall.
installing linacustic and GOM to Screen Wall.
Front of theater.
GOM going up on screenwall.
Front screen wall with insulshield.
GOM on screen wall.
Screen wall.
Left corner of screenwall.
Putting double layer of plywood on stage.
Putting plywood on steps.
Front of theater with black GOM installed.
View to the left.
Front wall with GOM installed.
Furring strips on left side of wall.
Electric curtain motor. BTX Motordrape.
Insulshield on soffit.
Insulshield on soffit.
Hanging GOM on soffit.
Installing Carina 2220 Garnet Red GOM.
Front of theater with sconce.
Furring out right side of theater.