2003.Dec.31 Wed The lean principle "See the Whole" is about seeing the whole of the project - not just the whole product, but the whole process. Ideally, Lean companies are lean all the way from Marketing to Human Resources, not just the development process. One way to see what waste there is in the development process is to compress it down to a week or three. If there are delays (wasting time) in going from requirements to design to deployment and testing, it will be more obvious -- a big, slow company that takes weeks for someone to approve something will have to change, or reject going lean. Similarly to making the whole process smaller to make things clearer, XP recommends working on user-centric stories -- implementing a "whole" feature all the way from bottom layer to top layer (or back end to front end). Many people would rather implement the bottom layer first, and the top layer last, or vice versa, but then you don't have a "whole" feature to test and demonstrate and learn from. Building the software "in layers" risks building a LOT of stuff before being able to demonstrate and test a single user-centric story or feature. On the Lean Development mailing list, John Roth summarizes the heart of Lean: (my emphasis)
Let's look at the seven core principles of lean, and compare them to Extreme Programming practices: 1. Eliminate Waste. Waste is anything that doesn't contribute to adding value to the product. One-hour status meetings waste time, so XP has 15-minute daily standup meetings instead. Excessive documentation and planning wastes time and energy, so XP recommends creating just enough documentation and planning, at appropriate levels of detail. Debugging is a waste, so XP does test-driven-development, which reduces debugging time and reduces time spent manually testing. Slow communication to/from the Customer/Domain Expert is a waste, so XP recommends having the Customer on-site. 2. Amplify Learning. Creating software is a 'learning' process. Typically developers do this learning alone, and that knowledge doesn't spread around to other developers very quickly. XP does coding in pairs to spread knowledge around faster. (Code reviews can also do this, but with higher overhead.) The Customer/Domain Expert is learning, too, as he sees his ideas implemented and developers ask him for details needed for acceptance tests. XP teams often do Retrospectives each iteration to bring learning to the whole team. Having all the developers and Customer working in a "war-room" also helps the whole team learn together. 3. Decide as Late as Possible. In Release Planning, stories are "promises for future communication" - the Customer/Domain Expert describes each feature/story in just enough detail for the engineers to provide a rough estimate. In Iteration Planning, the Customer describes the story in more detail, so the engineers can break it down into a task-list and/or rough design. The Customer/Tester specifies acceptance tests, which test the "what" not the "how", and then the programmers do test-driven-development where "what" tests and "how" coding are interleaved in a short cycle. 4. Deliver as Fast as Possible. "Simple Code" does everything necessary for the current requirements, but not more, so the team can ship it quickly. Keeping the quality high via test-driven-development avoids coding on an unstable foundation, wasting time debugging. Having the Customer/Domain Expert within range of spoken questions allows getting requirements into code in a minimum of time. 5. Empower the Team. XP encourages all team members to design, test, and code, instead of restricting those activities to a few. It encourages people to sign up for tasks, instead of assigning them to those who may not be as willing or as able. Anyone can improve code at any time, as long as the tests continue to run - allowing new learnings to be reflected in the code/design. 6. Build Integrity In. With short iterations where something isn't "done" until it passes (automated and manual) acceptance testing, and test-driven-development insuring that every line of code is tested, the XP team always builds on top of working software. In every iteration, all automated testing is repeated frequently, detecting as soon as possible any "breakage" of code. Any bugs found by manual testing or automated tests failing are not just fixed, but also force the creation of new automated tests. 7. See the Whole. Before beginning the first iteration, the XP team has a release plan. The Customer/Domain Expert has created that plan with the development team, and together they maintain and update the plan throughout the project, measuring and charting progress. Code is only implemented according to the current and previous requirements, so there is no work wasted on a requirement that may be dropped... however, engineers are not going to write code that will be difficult to adapt to that future requirement in that future comes around. To use the (not very good bridge-building analogy): the draw-bridge may not have motors in this iteration, but the builders are not going to build the bridge out of stone in this iteration, ignoring the need for mobility in the future.
By the way, I hate the "bridge-building" analogy, because writing software isn't building, it is designing. Running the compiler and linker associated "build" scripts, etc., are the "building". If building a bridge were as quick and easy as running a compiler and linker, we'd build bridges multiple times in order to test them. Any comparison of software development to bridges should be to designing bridges - an iterative, learning activity where multiple solutions are designed and tested (via mathematical/computer models or physical models) until all the requirements are met. |
|||||||||||||||||||||||