On June 3, 2006, the altar began the first leg of a journey -
out of my shop to temporary summer storage. I was assisted
by a terrific moving crew: Rich Blatchly, Terry Tarr, Lyle
Seger, Lee Hines and Brad Crenshaw. We removed the front,
side and rear panels, unbolted the top from the legs, then
unbolted the legs from the bottom frame. All the pieces were
securely wrapped for transport in the pickup trucks that Terry
and Lyle had brought. There was intermittent rain that day,
so we covered all the pieces with plastic tarps. Two hours
later, the disassembled altar was at its temporary summer
home on the basement floor of Rich Blatchly and Pat O-Hara's
home. The first seven photos show the June 3 diassembly
and moving phase.
In mid-August we were given the green light by Dole Brothers
Construction to move the altar into the new church. Terry
Tarr organized a crew and on August 22 moved the altar
pieces from Blatchly-O'Hara to the sanctuary floor of the new
church, still under construction. On August 30, Terry and I
reassembled the altar on the chancel, with some help from
Jim Harvey and Lyle Seger. The remaining photos show the
assembly process and how the altar looked on August 30.