title cad design comm Contents sources links Site
Contents

Design
Urban Information

Design Task
Context Animation
Glasgow Central Map
Glasgow Expansion Process
Specific Features 1
Specific Features 2
Specific Features 3

Urban Analysis

Urban Masses Map
Vacant Sites Map
Intervention Areas Map
Photos 1
Photos 2
Site Solar Study
Site Pedestrian Use

Proposals

Rail Link Scheme
Mixed Use Scheme
Building Layout
Proposal 1
Proposal 2
Proposal 3
Proposal 4
Proposal 5
Proposal 5A
Units
Structure
Flats
Buildings 1
Buildings 2
Flat Variants
Basic Proposal 3

propo1

This scheme proposal completes the internal courtyard in all 4 sides of the area, this offers the advantage of having a controlled private environment for the flat residents. On the other hand, the main benefits of being in a site with this strong urban character are not exploited fully, mainly because the introspection of this internal space is too strong.

Still is missing a clear defined route through the internal space, in order to get to the Barras Market. Also the scheme is answering equally to the 4 main sides of the project, a strategie that does not correspond to the site's nature.

mack Top Forward Back Contents
This page is maintained by WebMaster (Juan Pablo Ordonez)