title cad design comm Contents sources links Site
Contents

Design
Urban Information

Design Task
Context Animation
Glasgow Central Map
Glasgow Expansion Process
Specific Features 1
Specific Features 2
Specific Features 3

Urban Analysis

Urban Masses Map
Vacant Sites Map
Intervention Areas Map
Photos 1
Photos 2
Site Solar Study
Site Pedestrian Use

Proposals

Rail Link Scheme
Mixed Use Scheme
Building Layout
Proposal 1
Proposal 2
Proposal 3
Proposal 4
Proposal 5
Proposal 5A
Units
Structure
Flats
Buildings 1
Buildings 2
Flat Variants
Basic Proposal 2

propo1

This scheme proposal includes a "U" shaped strip of flats, closing the front on Moir St. but still leaving open the front on the new train station, this defines clearly the private nature of the internal courtyard space, but still does not differentiate clearly how public and private activities are going to be integrated and controlled.
Another missing element is a clear defined route through the internal space, in order to get to the Barras Market.

mack Top Forward Back Contents
This page is maintained by WebMaster (Juan Pablo Ordonez)