Nasonville Valley Railroad
This past summer, we finished grading, built a 92' long trestle and laying over 600' of track and balasted about 550'
This is the end of the line. 600'
A look at the trest with snow.
Looks like the real thing.
Winter runoff looks like a stream.
The tunnel in winter. Track to come next year.