Hawleyville looking west
|
Hawleyville looking east. The Work Train is in the distance.
|
New HRRC truck relocating old ties to the west.
|

|

|

|
|
HRRC Work Train loading stone Train powered this day by GP-9 7324 4/11/01
|
HRRC Work Train loading stone 4/11/01
|
HRRC Work Train loading stone 4/11/01
|

|

|

|
|
HRRC Work Train loading stone 4/11/01
|
HRRC Work Train loading stone 4/11/01
|
HRRC Work Train loading stone 4/11/01
|

|

|

|
|
HRRC Work Train loading stone 4/11/01
|
HRRC Work Train unloading stone at Hawleyville. 4/11/01
|
HRRC Work Train loading stone 4/16/01 Train is now powered by GP-35 3600.
|

|

|

|
|
HRRC Work Train with GP35 3600 takes the Shepaug Relad siding so NX-11 can pass westbound.
|
|
NX-11 4/16/01
|

|

|

|
|
|
|
After NX-11 passes, Work Train retakes the Maybrook Main.
|

|

|

|
|
Three Difco dump cars. Two borrowed from Metro North and one HRRC. Notice the yellow HRRC has yet to be tagged.
|
|
Work Train heads west to be loaded with ballast.
|

|

|

|
|
At Berkshire Junction, the Ballast Truck waited for west bound NX-11 to clear the Berkshire junction, going north. Then the truck was given permission to go east to the Hawleyville work site. Note the truck is going in reverse - east.
|
Behind (ahead) of the truck is a work car with rail piled on it.
|
The Truck is now at Hawleyville. It will put the car with rail on the new siding for the night and then clear up for the night.
|

|

|

|
|
|
|
The truck now comes down to the crossing to come off the rail and head back north to Canaan.
|

|

|

|
|
Stopped to lift the "rail wheels"
|
|
Now it's time to turn off!
|

|
|
The Work Train unloaded ballast and waited for the Truck to clear. Cleared, the Work Train now moves west. 4/16/01
|