| | A very large Zen garden. 12" off the top center and 6" added to the edges. |
| | | The step up and down from the field will be a lot easier. |
| | | A water main under the R-Room leaked again. This is part of the repair. |
|
| | The broken water main washed away this corner of the stands, next to the tunnel |
| | | R-Room, seat removal, turf change and water main repair. |
| | | The old endzone turf. Tough to find someone else that wants that shade of blue. |
|
| | Rolls of the new turf waiting to unfurl in the sun. |
| | | The men's rooms on the concourse are being renovated as well. |
| | | NW gate roof off to allow big drill truck entrance - for scoreboard footings. |
|
| | That's where the MOB sits (or sat - we'll see). |
| | | Possible new MOB flydown path from the corner of the second deck over no seats. |
| | | New aluminum benches ready for installation. |
|
| | The north endzone Slinky track. |
| | | The view south, from the big flagpole to the R-Room |
| | | Stadium panorama from the southeast corner of the concourse. |
|
| | SE corner panorama with partial turf |
| | SE corner 360 panorama during practice on 8.11.06 Double click to open |
| | | If this was Kyle Field, someone would be shouting "Green side up!" |
|
| | | stretching the latest piece |
| |
| | flattening with the "steam" roller |
| | |
| | starting the next five yards |
| | |
| | |
| | |
| | |
| | | The crew is using a pneumatic stitching machine to sew the pieces together |
| | | Sewing detail - maintaining alignment and sewing. |
|
| | Here's the rebar for the columns that will hold up the new scoreboard |
| | | Ready to go into a six foot diameter hole. |
| | | Panorama looking north from under the R-Room |
|
| | Panorama looking north from under the R-Room during practice |
| | | Here's the panoramic view from the top corner of the west upper deck. |
| | | Four footings for columns are poured in the north end. |
|
| | The jig used to align the anchor bolts |
| | | Anchor bolts - approximately 2.25" in diameter in a 6' hole |
| | | The old turf versus the new. |
|
| | The goalposts get a touch-up |
| | | Gold border on the lettering |
| | | Men's room stall plumbing |
|
| | | Men's room central plumbing. (blurry - sorry) |
| |
| | | Duke Sparks checks out the work |
| |
| | | Closeup of sewing in the owl logo |
| |
| | | Detail of the yellow border on the "I". |
| |
| | Wide-angle view from the SE corner. |
| | |
| | | Trying out the old tarps. |
| | | SE gate, lay-down area with stacks of Al bleachers |
|
| | View of downtown from the top with a 20mm lens |
| | | View of downtown from the top with a 500mm lens |
| | Rice Owls Football We Will Win grahamfootball.com |
|
| | FieldTurf with the rubber and sand added. |
| | | Line practice on the new field |
| |
| | | | Stadium Panorama West with Turf |
|
| | Found on the NE corner, top row. Anyone know this person? JD Morrison 6-15-50 |
| | | New helmet design - sorry about the blur, I moved the camera. |
| |
| | |
| | |
| | | Old north scoreboard is gone. |
| | | New turf has an interesting pattern after a heavy rain. |
|
| | New stripes on the stadium wall. |
| | | Closeup of new stripes on stadium wall. |
| |
| | | Field view of the new striped wall |
| | | Stripers caught in the act |
|
| | |
| | | IMG_8623 Something for scale |
|
| IMG_8624 The bolt to pick it up has to go through somewhere... |
| | IMG_8687 One of my souvenirs |
| | IMG_8626 The crated scoreboard |
|
| IMG_8629 See if you can read the weights |
| | IMG_8631 A Daktronics display |
| |
| IMG_8634 Something for scale |
| | |
| | |
| | |
| | |
| | |
| | |
| | |
| | IMG_8674 That's a 3.125" wrench. Bolts are 84" long and weigh 75 pounds each |
| |
| | The view of the north end of the stadium from the parking lot outside. |
| | | | First coat of paint on the second deck. |
|
| | Scoreboard pillars in the foreground, new bleachers going in in the background |
| | | Tying the pillars together. |
| | | Top-left-center puzzle piece of the new scoreboard |
|
| | The MOB is very happy to see these. |
| | | And will be even happier to hear them - part of the new sound system. |
| | | NW concourse women's room renovations. |
|
| | NW concourse men's room renovations moving along |
| | | An "Allstate" ad on the tarp over the tunnel. You're in good hands. |
| | | Unloading the next truckload of scoreboard crates. |
|
| | | display segments going in |
| | | tighter view of scoreboard installation |
|
| | One section to go of the video screen. |
| | | | Video section size - this IS the full-motion video screen resolution. |
|
| | The owl logo stuffed inside the center-top-right segment that says "OWLS" |
| | | Lifting another segment of the display |
| | The view south - what's that blue stuff in the tunnel? More later... |
|
| | | | Second deck drain replacement |
|
| | Metal drain pipes were replaced with PVC. |
| | | Ahhh - this is why there drips after the recent rain - it's not finished. |
| | | After packing the area with foam, some quick-setting stuff seals the gaps. |
|
| | The old-style drain, into the steel pipe in the column and the new drains. |
| | | Old endzone turf is now in the tunnel for cleat traction. |
| | | View from south goalpost. |
|
| | | Work continues on the sides of the scoreboard. |
| | | The endzone tarps are stretched out. |
|
| | The NE gate gets a touch-up. |
| | | Bleacher installation continues. |
| | | The NW corner bleachers are complete. |
|
| | | The bolts are now cut short and the nuts welded in place after torqueing. |
| | | New south scoreboard lights are in. |
|
| | New lettering over the tunnel. |
| | | New lettering on the face of the press box. |
| | | West side: lots of work going on. |
|
| | |
| | Progress, and some safety gear, if not hardhats. |
| | | Some of the conduit for the control and power lines. |
| | | The owl logo awaits installation. |
|
| | The last segment of "score" to be installed |
| | | Progress at 6:30pm on Thursday. |
| | | Duke Sparks talks to The MOB Show Assistants |
|
| | Through the windows you can see that the back wall of the PB is lettered. |
| | | ...and featuring Eugene Levy in the roll of Sammy the Owl... |
| | | They might try this expression for the new Sammy. |
|
| | Pep rally! TG fires up the students. |
| | | The t-shirt all good War Owls will wear to the game. |
| | | Lots of new stuff in the endzone. |
|
| | The tunnel-bone's connected to the helmet-bone. |
| | | Straight out of the helmet... |
| | | ...and face mask, into the spirit lines... |
|
| | Firing it up. It's supposed to stay "on" from now until game time. |
| | | Progress at 8:38am game day. |
| | | 8:40am - tightening up the bleachers in the SE corner. |
|
| | It's going to be a five camera setup. |
| | | | 10:18am - lifting the owl logo |
|
| | 10:21am The POV changes as MOB rehearsal moves me |
| | 10:23am The sign on the right is installed. |
|
| | |
| 10:48am Owl logo in place. |
| | | 11:08am compare with 8:38 above. |
| | | Look thru the windows - the double-helix is on the back wall above "RICE". |
|
| | The final hour before the game. |
| | | What the scoreboard looked like. |
| | | The east stands, about three minutes before the half. |
|
| | The rest of the east stands, showing those seated on concrete (by choice!) |
| | | An oblique POV on the west stands just before the half. |
| | | Closeup of the student section just before the half. |
|
| | Q. Smith crosses the plane of the goal. Tiny Canon Elph not made for this... |
| | | The view south from The MOB's seats. The crowd on the concrete. |
| | | The west stands at the end of the third quarter. |
|
| | Libra and the Little Squiggle constellation on the old board. |
| | | Asphalt around the pillar to keep people from falling in the hole. |
| | | The back, showing the ladders and catwalks. |
|
| | The frames are on the big ads and a detail unnoticed on "Bud Light" |
| | | I'm sure that everyone will read these words. |
| | | Another odd improvement, seen in the next closeup. |
|
| | The ticket staff wants to see the game too |
| | The big sand-box 24 January, 2008 |
| | | Rice Stadium - home of Rice Foot |
|
| | East concourse water main work |
| | | SE concourse water main work |
| | | More water main work - looking at the East stands |
|
| | Water main work under the R-Room. |
| | | The new logo (blurry - sorry - it was pretty dark) |
| | | North endzone tarps - note the spacing on the shield on the right. |
|
| | Larger view of the North endzone tarps. |
| | | South endzone tarps - note shield spacing and narrow tarp-free area. |
| | | Detail of the tarp attachment on the Sound end. |
|
| | Crude, not-quite-aligned pair of maps showing Harris Gully under modern Rice |
| | | 8/28 - This just caught my eye |
| |
| | 8/28 - the view from the south end zone |
| | | 8/28 - touching up the big scoreboard |
| | | 8/28 - adding a banner to the R-Room |
|
| | 8/28 - a major donor helps deal with the old video board |
| | | 8/29 - west side crowd during the first quarter |
| | | 8/29 - east side crowd just before halftime |
|
| | |
| | Strengthening connections between Rice and TMC |
| | |