Home Improvement  |  The Granite for the Bar Area  |  Kitchen Design  |  Cabinet Samples  |  The Deck comes off  |  The Awful Before Kitchen  |  Week One -- It Begins  |  Week Two  |  Week Three -- Kitchen Demo  |  Weeks 4-6  |  Week 7  |  Week 8  |  Week 9-10  |  New Kitchen Plans  |  Weeks 11-14  |  Weeks 15-16  |  Week 17-19  |  Week 20-21  |  Week 22  |  Week 23-25.3  |  Week 26-28
 

Week 20-21, August 30 - September 12, 2004
Outside work, countertops added, more progress on the electrical and plumbing, and the flooring people have started their work.
   

Preparing for the new steps.
This area will be our new patio
A new sidewalk has been poured
This will help with our water seepage on this side of the house
Painters have been scraping and caulking. The upper trim has been painted!
Our Kohler sink has been installed in the bathroom
Grohe Tenzo faucet is better than we expected!
New tile in the entryway
That stack of wood is our new kitchen floor!
The Corian ('linen') has been installed.
I love this corian seamless sink~~
And our range has been dropped into place.