Home Improvement  |  The Granite for the Bar Area  |  Kitchen Design  |  Cabinet Samples  |  The Deck comes off  |  The Awful Before Kitchen  |  Week One -- It Begins  |  Week Two  |  Week Three -- Kitchen Demo  |  Weeks 4-6  |  Week 7  |  Week 8  |  Week 9-10  |  New Kitchen Plans  |  Weeks 11-14  |  Weeks 15-16  |  Week 17-19  |  Week 20-21  |  Week 22  |  Week 23-25.3  |  Week 26-28
 

Weeks 11-14 - June 28 - July 25, 2004
Preparing for the Stucco - plumbing, HVAC and electrical go in.
   

House is getting ready for stucco
Lots of scaffolds
South side
Plumbing through the dining room ceiling
Wires
and more wires
Soffit for the bar cabinets
South kitchen wall
East kitchen wall
Soffit in the kitchen for the HVAC
Plumbing tiein in the linen closet
Sitting room . . plumbing vent pipe
Sitting room wall
Bathroom wall
Bathroom ceiling
There's the tub
Bathroom
The hallway is taking shape
HVAT up through the kitchen wall
In the basement
Wires in the wine cellar
HVAC too
More wires
wires and ducts.
Through the existing basement
Waiting for a new electrical panel