Home Improvement  |  The Granite for the Bar Area  |  Kitchen Design  |  Cabinet Samples  |  The Deck comes off  |  The Awful Before Kitchen  |  Week One -- It Begins  |  Week Two  |  Week Three -- Kitchen Demo  |  Weeks 4-6  |  Week 7  |  Week 8  |  Week 9-10  |  New Kitchen Plans  |  Weeks 11-14  |  Weeks 15-16  |  Week 17-19  |  Week 20-21  |  Week 22  |  Week 23-25.3  |  Week 26-28
 

Week 9-10 - June 14-27, 2004
The last two weeks was spent putting in all the additional support for the roof and dormers, both upstaird and downstairs.
   

First, I took off the walls down to the studs into the new dormer sitting room
The framers have been here!
Looking into the dormer
The hallway is framed. See the back of the shower? It faces into the bathroom
Looking down the hall . . a wider view
Unfortunately, we have to keep those angled supprts.
Looking back the other way.
Looking out from the sitting room dormer. We need a railing
The ceiling over the stairs will be vaulted
In the dining room, supports have been added to the ceiling.
Looking toward the back
Looking toward the living room.
Looking from the kitchen
New kitchen wall
Looking from the kitchen
New door hardware has arrived
Upstaris is all framed. This will be a solid wall railing.
That won't be too bad to walk under.
Here's a little bit of storage at the top of the stairs.
Looking out from the sitting room toward the stairs.
This will be a linen closet in the hall.
Here's the shower stall
And there will be shelves next to the shower here.