Home Improvement  |  The Granite for the Bar Area  |  Kitchen Design  |  Cabinet Samples  |  The Deck comes off  |  The Awful Before Kitchen  |  Week One -- It Begins  |  Week Two  |  Week Three -- Kitchen Demo  |  Weeks 4-6  |  Week 7  |  Week 8  |  Week 9-10  |  New Kitchen Plans  |  Weeks 11-14  |  Weeks 15-16  |  Week 17-19  |  Week 20-21  |  Week 22  |  Week 23-25.3  |  Week 26-28
 

Week One -- It Begins -- April 19-25, 2004
We've made a lot of progress this week. A new hole - a new foundation - and a new basement room has been poured.
   

Before - front
Before - side
Before - back
Before - back - ready for digging
I pulled the hosta and bulbs out from the front bed
Day one - The digging begins
Getting deeper
Man - that's a lot of dirt
And more dirt
Trucking it away
He's a pro with the back hoe
What a mess
This machine has been working overtime
Day two - preparing for the footings
Ah - the cement has arrived
Getting the boom in place
Cement is flowing
Don't look so excited, dude!
Our guy is moving fast
The lilacs were relocated to the front yard
See the bushes have been pulled out
The kids love the dirt!!!
Footings are all ready for the walls
Left side of the front stairs
Lilacs all settled in
Right side of the stairs
The side sidewalk has been removed for the new patio walkway
Here's day 4 and 5 - frames were installed yesterday
Concrete has been poured today
A fence to keep the kids out
Here's a view from the other side
A view from the garden
Oh man, there were a lot of rocks to remove
I think it's ready for some top soil
Day 6 - Frames have been removed
We have a basement!