| | Before - back - ready for digging | |
| | | I pulled the hosta and bulbs out from the front bed | |
| | | Day one - The digging begins | |
|
| | | Man - that's a lot of dirt | |
| |
| | | He's a pro with the back hoe | |
| |
| | This machine has been working overtime | |
| | | Day two - preparing for the footings | |
| | | Ah - the cement has arrived | |
|
| | Getting the boom in place | |
| | | | Don't look so excited, dude! | |
|
| | | The lilacs were relocated to the front yard | |
| | | See the bushes have been pulled out | |
|
| | The kids love the dirt!!! | |
| | | Footings are all ready for the walls | |
| | | Left side of the front stairs | |
|
| | | | The side sidewalk has been removed for the new patio walkway | |
|
| | Here's day 4 and 5 - frames were installed yesterday | |
| | | Concrete has been poured today | |
| | | A fence to keep the kids out | |
|
| | Here's a view from the other side | |
| | | | Oh man, there were a lot of rocks to remove | |
|
| | I think it's ready for some top soil | |
| | | Day 6 - Frames have been removed | |
| |