Canoe Building 2
Strongback is complete, start installing the forms, lining it all up and start laying the strips.
Installing the first forms
Forms installed
Adjusting the forms to line everything up
All lined up
Laying the first strip on both sides
Adding second strip. trying to go stapleless
Using polyurethane glue for first two strips
Starting to build up the ends
Ends built up.