| | Layout Schematic, including benchwork outlines (Empire Express) | |
| | | | Transferring the track plan (Empire Express) | |
|
| | Transferring the track plan (Empire Express) | |
| | | Roadbed and turnouts intalled (Woodland Scenics, Tillig Pilz Elite) | |
| | | Foam risers and roadbed installed (Woodland Scenics) | |
|
| | Control Panel Layout in Empire Express | |
| | | Control Panel by A&R Engravers, Salem, MA | |
| |
| | | Control Panel hinged mounting. Swings up for use, down for storage. | |
| | | Ballasting the track and adding some bushes (there's water under the bushes,... | |
|
| | Ballasted track and a UP SW1200 (Proto-2000) | |
| | | Building using poster paint for stone grout: front | |
| | | Building using poster paint for stone grout: front (no flash) | |
|
| | Building using poster paint for stone grout: back (no flash) | |
| | |