Great Northern Layout Index  |  Introduction  |  Information  |  Diagrams  |  Stairs  |  Room 1  |  Room 2  |  Trains 1  |  Trains 2  |  Trains 3  |  Trains 4  |  Trains 5  |  Trains 6  |  Stage 1  |  Stage 2  |  Belton  |  Columbia Falls  |  Essex 1  |  Essex 2  |  Glacier Park  |  Shelby 1  |  Shelby 2  |  Summit  |  Whitefish 1  |  Whitefish 2  |  Crew 1  |  Crew 2
 

Great Northern Layout.
Great Northern Railway - Kalispell Division.
Whitefish 1.
Click on item to expand size.
Eastward view of Whitefish yard
from service area on upper level
above Summit on lower level.

Locomotive and caboose
service area at left.

Yard engineer box
for yard engineer
instruction card,
box for sorting car waybills
and track boxes for car waybills.

Intercom at right of box
for Summit and stage
station operators.

Stock yard
with 4 loading chutes,
icing for 28 reefers
on two tracks,
depot and TOFC ramp
from left to right beyond box.

Single track thru stairs
beyond depot at right.
Click on item to expand size.
Whitefish Diagram.
Click on item to expand size.
Westward view of Whitefish yard
from east of fuel depot office.

Fuel depot at right.

Yardmaster box
for yardmaster instruction card,
train instruction cards,
blocking cards for car waybills,
box for sorting car waybills
and track boxes for car waybills.

Intercom at left of box
for yardmaster.

Stock yard with 4 loading chutes,
icing for 28 reefers on two tracks,
depot and TOFC ramp
from right to left beyond box.

Locomotive and caboose
service area with turntable
and roundhouse beyond depot.

Stage beyond service area at left.