| | | Cornerless corner. June 2 | |
| | | Only a Job-dog would find nails for a pillow! June 3 | |
|
| | Walk-out walls underway. June 3 | |
| | | Dressing the beam at the lumberyard. June 4 | |
| | | Ready for the beam. June 4 | |
|
| | A look at the staging prepared to support the beam. June 5 | |
| | | Spiking the chain for non-slipage. June 5 | |
| |
| | | Getting into position. June 5 | |
| |
| | Perfect, don't move. June 5 | |
| | | | Some sheathing done. June 5 | |
|
| | First interior wall. June 5 | |
| | | New home for the beam. June 5 | |
| |
| | | Engineered floor system. June 12 | |
| | | Framing around the fire place. June 13 | |
|
| | Welding post bases. June 27 | |
| | | Welding post tops. June 27 | |
| |
| | Basement stair stringers. Aug. 1 | |
| | |