| | Wall of limestone is readied for pointing. March 25 |
| | | | Brian points the stone with a silacone based caulk. |
|
| | Caulking is tooled to a neat finish. March 25 |
| | | Stair parts are stocked. April 6 |
| | | Aarron faces the landings with steel sheet material which matches the stairs. |
|
| | Kent confirms some dimentions. |
| | | A beefy landing in place. |
| | | 1ST stringer in position. |
|
| | |
| | | Lugging the second 400lb landing in. April 7 |
| |
| | Kent checks the rise of the last stringer to go in. April 7 |
| | | The last stringer set in place. April 7 |
| | | Backlit stair winders. April 7 |
|
| | Tile landing and risers to the basement. |
| | |