| | Roughing in the hole. Sept 2 |
| | | A meeting in the bottom. Sept 2 |
| | | Footer forms on the ledge. Sept 5 |
|
| | |
| | Forms surround the steel. Sept 10 |
| | |
| | | Forms ready for concrete. Sept. 10 |
| |
| | | The supply truck. Sept 10 |
| | | Topping off the walls. Sept 10 |
|
| | A look from above. Sept 10 |
| | | With the forms removed. Sept. 15 |
| | | Filling in the space under the slab. Sept. 17 |
|
| | Pouring the floor. Sept 18 |
| | | | An I-beam to hold other I-beams. Sept 24 |
|
| | Setting the I-beams. Sept 24 |
| | | The junctions of the beams were tack welded. Sept 24 |
| | | The smaller I-beams. Sept 24 |
|
| | Setting the metal sheets. Sept 24 |
| | | Metal floor complete. Sept 24 |
| |
| | Floor is poured over the steel. Oct. 7 |
| | | Power trowling the new garage floor. Oct 8 |
| |