| | First window in the window wall. Aug 8 |
| | | One column of windows done. Aug 12 |
| |
| | A seventh window in the wall. Aug 12 |
| | | Now up to ten windows in the wall. Aug 12 |
| | | Closing in on completing the window wall. Aug 12 |
|
| | The interior wall won't allow this unique view so here it is preserved. Aug 15 |
| | | The view through glass. Aug 15 |
| | | So this is cathedral! Aug 15 |
|
| | Window Wall complete! Aug 19 |
| | |
| | ...from the outside. Aug 19 |
| | | A new west window opening. Aug 21 |
| | | The point with window openings. Aug 21 |
|
| | West wall with new window opening. Aug 21 |
| | | Stepped window for Skyroom. Aug 25 See "wall panels" for opening. |
| | | Skyroom windows being installed. Aug. 26 |
|
| | | | A plastic sheet covers the tower wall that will be glass plank. Sept. 2 |
|
| | A view showing the windows in the point. Sept 10 |
| | | West windows in the point. Sept 10 |
| | | East point window. Sept 10 |
|
| | Glass installed in corner windows. Sept.17 |
| | | Installer sealing the glass joint. Sept 17 |
| |
| | Corner glass at main entryway. |
| | | Roof windows in the master bedroom. Nov 30 |
| | | Ice flowers form on the corner glass from the moisture from the plaster coat. |
|