Framing the Third Level
Third Level (second floor) deck is completed and more framing of the third level will be found here.
Most of the forth level joists are in place. July 1
Interior walls form bathroom. Aug 15
A sharp corner. Aug 15
A door to the attic. Aug 19
The master bedroom serves as cut station for now. Aug 25
Master bedroom closet. Aug 25